BP Sunbury Switch Panel

BP Sunbury Switch Panel BP Sunbury Switch Panel BP Sunbury Switch Panel BP Sunbury Switch Panel BP Sunbury Switch Panel

SERVICES GIVEN

Electrical

TAGS

SHARE

BP Sunbury Laboratory facilities Switchboard Replacement. On Behalf of ECO of London, CB Services carried out the replacement of the existing 1200 amp switchboard which was of age where it was unsupportable and non-compliant. We were responsible for design development, installation and commissioning of the new 1200 amp supply LV switchboard.The programme was 7 Days.

The works included the following:

Intrusive site surveys to include electrical testing to all sub main circuits supplied from the existing switch panel

  • Manage the design of the new panel to ensure all existing cables & switches where installed to suit existing cable lengths as far as possible
  • Installation of temporary light and small power to safety critical circuits within the labs.
  • Isolation, disconnection, strip out and removal of the existing LV switchboard.
  • Installation of new LV switchboard.
  • Testing and commissioning of new LV switch board including testing of all connected circuits and EPO contactors/BMS connections.
  • O&M documentation